Kuhse controls for the expansion of the Pesanggaran diesel power plant on Bali

In order to ensure the power supply on Bali, the existing Pesanggaran power supply plant at the Denpasar site was expanded by the operator Indonesia Power to include a further 3 MAN engines of type MAN 18V 48/60 (each 18.9 MW). Since then, the diesel power plant has fed a total of 162 MW of electrical power into the national grid.

[Translate to Englisch:]
[Translate to Englisch:]
[Translate to Englisch:]

Kuhse received the award for the plant switchgear and control system. Installed in the plant are the Siemens S7-400 PLC in combination with central and decentralised modules. The scope of supply included the common control, the engine and generator control panels and the superordinate SCADA system based on WEBfactory. 
Additionally, Kuhse Service carried out interface clarification with respect to the plant components from Indonesian suppliers and the commissioning of the plant.
Remote access was established retrospectively via a secure VPN connection, in order to guarantee the customer on-site support and enable the implementation of program adjustments.