Kuhse received the award for the delivery and commissioning of the switchgear for the control, low voltage distribution and auxiliary drives for the plant. In addition, Kuhse also carried out the planning of the installation and the configuration of the electrical protective elements.
Due to the high environmental standards on the part of the government, the CO2 emissions in Costa Rica are to be considerably reduced - in part through the closure of coal-fired power stations. In order to comply with the strict environmental regulations in Costa Rica and those of the World Bank, a system was constructed for cleaning the exhaust gases from the diesel power plant by means of electrostatic filters.